Chicago-based HSA Commercial Real Estate today has started construction on four warehouses totaling 1.9 million square feet along the Interstate-94 corridor, between the Chicago and Milwaukee metros.
The buildings include one in northern Illinois and three in southeast Wisconsin. All are being built on a speculative basis, or without tenants lined up in advance.
HSA Commercial’s new developments are:
- Delany Commerce Center II – 2451 North Delany Road, Waukegan, Illinois:
Phase 2 of the Delany Commerce Center, located in Waukegan, Ill., will be a 218,500-square-foot warehouse offering immediate access to Interstate 94 and Highway 41. Construction began in October, with anticipated completion in July 2023.
The industrial building, which is located adjacent to a 218,500-square-foot distribution facility HSA Commercial developed in 2014, will feature 36-foot clear heights, an ESFR sprinkler system, 28 truck docks, four drive-in doors, 130-foot truck court depth and parking for 300 cars. The building will be divisible to 55,000-square-foot suites.
Harris Architects is serving as project architect, PREMIER Design + Build Group as general contractor and Manhard Consulting as civil engineer. The space will be leased by Colliers.
- Park 94, Building IV – 975 Carrington Blvd., Mt. Pleasant, Wisconsin:
Construction began in October on the fourth warehouse at Park 94, a 184-acre Class-A industrial park at the corner of Interstate 94 and Highway 20 in Mt. Pleasant, Wisconsin. HSA Commercial completed its first phase of the park in 2009, which helped spark development of the area as a logistics and manufacturing hub. Park 94 already is home to the headquarters for Seda International Packaging Group, InSinkErator, Ryder Last Mile Inc., and Typenex® Medical LLC, among other users.
Scheduled to deliver in July 2023, Building IV will measure 226,148 square feet and feature 36-foot clear heights, 52 truck docks, two drive-in doors, and parking for 37 trailers and 286 cars. The space will be leased by CBRE.
- Bristol Highlands Commerce Center West – 9414 136th Ave., Kenosha, Wisconsin:
In early November, HSA Commercial broke ground on a 550,647-square-foot warehouse – the first of three buildings in the firm’s new Bristol Highlands Commerce Center West project at the southeast corner of 136th Avenue and Wilmot Road in Kenosha, Wis. The new 82-acre warehouse park will total 1.3 million square feet upon full buildout and is located near HSA Commercial’s existing Bristol Highlands Commerce Center East development. Together, the two phases will total six buildings and 2.4 million square feet.
Scheduled to deliver in third-quarter 2023, Bristol Highlands Commerce Center West will feature 40-foot clear heights, 79 truck docks, four drive-in doors, and parking for 106 trailers and 256 cars. The space will be leased by CBRE.
- Highland Commerce Center of Somers – 2655 113th Ave., Kenosha, Wisconsin
Also this month, HSA Commercial broke ground on one of Wisconsin’s largest-ever speculative industrial buildings: Highland Commerce Center of Somers, a 918,844-square-foot distribution center located directly off I-94 at the Burlington Road interchange in Kenosha, Wis.
Highland Commerce Center of Somers will offer state-of-the-art features that include 40-foot clear heights, 109 dock doors, 165 truck trailer parking stalls and 511 employee parking spaces. The building is expected to be complete in third-quarter 2023. The space will be leased by Cushman & Wakefield.
For the three Wisconsin developments, Partners in Design is serving as project architect, PREMIER Design + Build Group as general contractor and Pinnacle Engineering Group as civil engineer.