Skip to content
Homepage
  • Market
    • Illinois
    • Indiana
    • Iowa
    • Kansas
    • Kentucky
    • Michigan
    • Midwest
    • Minnesota
    • Missouri
    • N Dakota
    • National
    • Nebraska
    • Ohio
    • S Dakota
    • Tennessee
    • Texas
    • Wisconsin
  • Sector
    • CRE
    • Education
    • Finance
    • Healthcare
    • Hospitality
    • Industrial
    • Legal
    • Multifamily
    • Net Lease
    • Office
    • Retail
    • section
    • Seniors Housing
    • Student Housing
  • Events
  • Real Estate Awards
  • Best of the Best
  • Hall of Fame
  • Media & Marketing

Skender completes compounding pharmacy for major Chicago hospital

July 16, 2020
Share on Facebook Share on Twitter Share on LinkedIn Share via email
Previous Next

Skender, serving as general contractor, recently completed interior construction of a 7,500-square-foot compounding pharmacy at a large Chicago hospital. The project consolidates three existing oncology pharmacies while expanding capacity to support projected growth.

The new sterile pharmacy allows for the safe preparation, mixing and packaging of drugs to meet individual patient needs. It features six compounding spaces that were constructed using cleanroom design to keep airborne particles within specified limits. The project also includes 17 mixing hoods, refrigerated and non-refrigerated drug storage and an interlocked anteroom with cleanroom doors that allow the opening of only one door at a time.

To comply with cleanroom specifications, material selection included solid surface wall protection, Terra Universal cleanroom doors, lab casework and extensive mechanical equipment to support cleanroom functionality and standards. Skender worked with Kahler Slater and ESD to successfully complete the new pharmacy.

The project took place within an active hospital, requiring special logistics and safety measures, such as precise-sized materials to fit elevators, extensive noise and vibration controls and electrical and plumbing shutdown coordination. With space and access constraints, a knockdown air handling unit was delivered in panelized sections, assembled and installed on site over four weeks. 

Tags
ChicagoesdKahler SlaterSkender
" "

Subscribe

Subscribe to our email list to read all news first.

Subscribe
Related Articles
IllinoisMultifamily

Chicagoland Apartment Association names recipients of its Pathways to Excellence scholarship

October 6, 2026
IllinoisIndustrial

CBRE reps seller in $2.75 million sale of vacant industrial building in Chicago’s Fulton Market neighborhood

October 6, 2026
IndianaIndustrial

Colliers closes sale of Mohr Logistics Park Building 6 in Whiteland

October 6, 2026
TexasCRE

Partners Land Fund I brokers sale of 16.7-acre land parcel at Waco Gateway Park

October 6, 2026

Subscribe

Subscribe to our email list to read all news first.

Subscribe
REJournals logo

Market

  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Michigan
  • Midwest
  • Minnesota
  • Missouri
  • N Dakota
  • National
  • Nebraska
  • Ohio
  • S Dakota
  • Tennessee
  • Texas
  • Wisconsin

Sector

  • CRE
  • Education
  • Finance
  • Healthcare
  • Hospitality
  • Industrial
  • Legal
  • Multifamily
  • Net Lease
  • Office
  • Retail
  • section
  • Seniors Housing
  • Student Housing

Subscribe

Subscribe to our email list to read all news first.

Subscribe
  • Events
  • Office Locations
  • Terms and Conditions
  • Contact
© 2026 REjournals.com