Skip to content
Homepage
  • Market
    • Illinois
    • Indiana
    • Iowa
    • Kansas
    • Kentucky
    • Michigan
    • Midwest
    • Minnesota
    • Missouri
    • N Dakota
    • National
    • Nebraska
    • Ohio
    • S Dakota
    • Tennessee
    • Texas
    • Wisconsin
  • Events
  • Sector
    • CRE
    • Finance
    • Healthcare
    • Hospitality
    • Industrial
    • Legal
    • Multifamily
    • Net Lease
    • Office
    • Retail
    • section
    • Seniors Housing
    • Student Housing
  • Real Estate Awards
  • Subscribe
  • Publications
MidwestIndustrial

Missner Group in final states of $8M build-to-suit

Staff Writer April 5, 2017
Share on Facebook Share on Twitter Share on LinkedIn Share via email

The Missner Group is near completion of an $8 million, 60,000-square-foot build-to-suit for Greenwood Associates, Inc., a national processor of fruit juice concentrates, essential oils and purees. Located at 6280 W. Howard Street in Niles, Ill, the new facility for Greenwood Associates represents one of the most significant build-to-suits in the marketplace within the past year.

Greenwood Associates required the new space in Niles for the blending and processing of food concentrates which are inventoried for distribution to manufacturers of salad dressings, fruit juices, alcoholic beverages, etc. The newly included the construction of an onsite laboratory with microbiology and acid/PH testing capabilities to demonstrate food safety compliance; holding tank and blending tank rooms with concrete containment walls; and 3,000 Amp 480 Volt electrical service with a safety switch for temporary back-up power generation for critical systems.

The new processing facility includes a box-in-a-box cooler and freezer, installed by The Missner Group, which feature metal insulated ceilings and walls, roof-mounted condensing units and ceiling-mounted evaporators, and floors constructed with an in-slab glycol heating system all of which ensure that the temperatures remain 35°F and -10°F respectively. The property also features multiple production areas constructed with insulated metal walls, food-grade drop ceilings with FRP panels, and ¼” epoxy, urethane flooring.

Pre-construction services were provided by Barry Missner, principal, and the design and construction was led by Glen Missner, principal, and Jess Knigge, vice president. Cornerstone Architects provided the architectural services for this project.

Tags
The Missner Group
" "

Subscribe

Subscribe to our email list to read all news first.

Subscribe
Related Articles
TexasHealthcareOffice

Cushman & Wakefield arranges 18,730-square-foot lease on behalf of DECA Dental Group

May 27, 2022
IllinoisCRE

Brokers: Need to improve your technology game? Here are five ways…

Sam BadgerMay 27, 2022
KansasHealthcare

Montecito Medical acquires 33,600-square-foot surgery center in Wichita

May 27, 2022
TexasIndustrial

Loomis expands Houston presence with new location

May 27, 2022

Subscribe

Subscribe to our email list to read all news first.

Subscribe
REJournals logo

Market

  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Michigan
  • Midwest
  • Minnesota
  • Missouri
  • N Dakota
  • National
  • Nebraska
  • Ohio
  • S Dakota
  • Tennessee
  • Texas
  • Wisconsin

Sector

  • CRE
  • Finance
  • Healthcare
  • Hospitality
  • Industrial
  • Legal
  • Multifamily
  • Net Lease
  • Office
  • Retail
  • section
  • Seniors Housing
  • Student Housing

Subscribe

Subscribe to our email list to read all news first.

Subscribe
  • Contact Us
  • Events
  • Office Locations
  • Advertise/Editorial Calendar
© 2022 REjournals.com