The Missner Group announced that the firm has completed a $35 million tenant improvement, repurposing project on behalf of Peacock Engineering Co. at 1001 W. Crossroads Parkway in Romeoville, Illinois.
“The extensive project included a demolition of existing interior space to reconfigure the facility for an entirely new use,” said Barry Missner, president of The Missner Group. “The construction of a food processing facility requires a substantial knowledge of the systems needed to process food safely as well as the various rules and regulations of the USDA. Our team, well-versed in this type of construction, assembled a strong team of experts and coordinated the process to ensure an efficient comp letion of the specialized space.”
Located within ProLogis Park 55, the facility will be used to repackage frozen goods which requires portions of the building to be temperature controlled to specific degrees at all times. The 532,560 square foot project included the complete renovation of the existing warehouse; the addition of 20,000 square feet of office space; multiple processing areas and production lines; and temperature controlled storage spaces.