Skip to content
Homepage
  • Market
    • Illinois
    • Indiana
    • Iowa
    • Kansas
    • Kentucky
    • Michigan
    • Midwest
    • Minnesota
    • Missouri
    • N Dakota
    • National
    • Nebraska
    • Ohio
    • S Dakota
    • Tennessee
    • Texas
    • Wisconsin
  • Sector
    • CRE
    • Education
    • Finance
    • Healthcare
    • Hospitality
    • Industrial
    • Legal
    • Multifamily
    • Net Lease
    • Office
    • Retail
    • section
    • Seniors Housing
    • Student Housing
  • Events
  • Real Estate Awards
  • Subscribe
  • About
IllinoisIndustrial

Ware Malcomb provides architecture, interior design work on first phase of Edged data center in Aurora

March 3, 2025
Share on Facebook Share on Twitter Share on LinkedIn Share via email
Photo courtesy of Ware Malcomb.

Ware Malcomb announced that construction is complete on the initial phase of a new Edged data center and office space project west of Chicago in Aurora, Illinois.

Ware Malcomb provided architecture and interior design services for the new 210,000-square-foot building, situated on a 65-acre campus site that will ultimately feature 96MW of capacity powered by renewable energy.

Edged, the fast-growing sustainable infrastructure provider, celebrated a major milestone yesterday with the grand opening of its new ultra-efficient data center in Aurora, Illinois, The Edged campus project is developed by Seefried Industrial Properties, a privately owned, nationally recognized leader in industrial real estate, with over four decades of development, leasing and management experience in core markets throughout the U.S.   

The Edged Chicago campus was designed to be a model for modern engineering and sustainable infrastructure initiatives and uses significantly less energy than traditional data centers. Among the campus features are an innovative waterless cooling technology that ensures operational efficiency while setting a new industry standard for Power Usage Effectiveness with an average PUE of 1.15 portfolio wide. Other sustainable site highlights will include on-site solar generation, EV charge points, and alternative fuel-powered backup generators. 

The building interior can accommodate colocation of multiple tenants and includes 13,000 square feet of office area, comprising a lobby, conference room, and break room. The exterior design features a distinctive glass façade on the north and south sides, added at the request of the city to enhance visual appeal along the adjacent tollway. 

General contracting services for the project were provided by FCL Construction.

Tags
AuroraEdged data centerIllinois
" "

Subscribe

Subscribe to our email list to read all news first.

Subscribe
Related Articles
IllinoisRetail

Mid-America Real Estate Corporation brokers sale of 171,860-square-foot shopping center in Geneva

March 19, 2026
IllinoisIndustrial

Des Plaines-based CORFAC International adds

March 19, 2026
WisconsinRetail

Mid-America Real Estate Corporation brokers sale of 51,361-square-foot Whole Foods Market in Madison

March 19, 2026
TexasRetail

Five new lease agreements bring New Caney’s Valley Ranch Town Center closer to full occupancy

March 19, 2026

Subscribe

Subscribe to our email list to read all news first.

Subscribe
REJournals logo

Market

  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Michigan
  • Midwest
  • Minnesota
  • Missouri
  • N Dakota
  • National
  • Nebraska
  • Ohio
  • S Dakota
  • Tennessee
  • Texas
  • Wisconsin

Sector

  • CRE
  • Education
  • Finance
  • Healthcare
  • Hospitality
  • Industrial
  • Legal
  • Multifamily
  • Net Lease
  • Office
  • Retail
  • section
  • Seniors Housing
  • Student Housing

Subscribe

Subscribe to our email list to read all news first.

Subscribe
  • Events
  • Office Locations
  • Terms and Conditions
  • Contact
© 2026 REjournals.com