Kraus-Anderson started a $13 million expansion at Huron Regional Medical Center at 172 4th St. in Huron, South Dakota.
Designed by Wold Architects and Engineers, the 7,500-square-foot addition will feature four new operating rooms, staff lockers and a lounge. The project also includes an 11,581-square-foot renovation of the existing OR suite, endoscopy rooms and pre and post operating rooms; and a new 19,081-square-foot a sterile processing area and support spaces.
At a groundbreaking event, Dr. Kevin Hofer, an HRMC orthopedic surgeon, said the new surgical suites will be equipped with advanced tools and technologies that support precision and efficiency, along with space and tech to continue to grow and evolved. “The expansion represents more than an infrastructure improvement, it’s a leap forward, and how we care for our friends and neighbors.”
Construction is expected to be completed in November of 2026.
