Skip to content
Homepage
  • Market
    • Illinois
    • Indiana
    • Iowa
    • Kansas
    • Kentucky
    • Michigan
    • Midwest
    • Minnesota
    • Missouri
    • N Dakota
    • National
    • Nebraska
    • Ohio
    • S Dakota
    • Tennessee
    • Texas
    • Wisconsin
  • Sector
    • CRE
    • Education
    • Finance
    • Healthcare
    • Hospitality
    • Industrial
    • Legal
    • Multifamily
    • Net Lease
    • Office
    • Retail
    • section
    • Seniors Housing
    • Student Housing
  • Events
  • Real Estate Awards
  • Subscribe
  • About

Semi-robotic construction techniques debut at Great Lakes Naval Base

October 14, 2019
Share on Facebook Share on Twitter Share on LinkedIn Share via email

Clark Construction Group is debuting semi-robotic construction technology at Great Lakes Naval Base in Great Lakes, Illinois, just north of Chicago. Conducted in conjunction with their engineering partner, Construction Robotics, this is the first construction project in the country to deploy MULE (Material Unit Lift Enhancer) and SAM (Semi-Automated Mason) technology.

The machines—being used to construct a new, 166,000 square-foot barracks facility for enlisted military personnel at the Great Lakes Naval Base—display cutting edge robotics innovation poised to change how masonry is approached. The two robotic technologies work in tandem to vastly improve safety, quality and job site productivity in many ways.

MULE has the capability of lifting 135 pounds, with each 32-inch CMU block weighing roughly 70 pounds. The system also offers a fully modular design that can be configured multiple ways and easily moved around the job site. The SAM technology is capable of laying a brick every 7 to 10 seconds, employing a unique programming that is also designed to allow the machine to lay bricks in complex patterns.

Clark is one of the nation’s leading providers of civil and building construction services, holding a long-standing tradition of leveraging innovative tools and technologies to improve its construction processes. This new semi-robotic technology ensures that Clark remains ahead of the curve when it comes to new construction technology.

Tags
Clark Construction GroupConstruction RoboticsGreat LakesGreat Lakes Naval BaseIllinois
" "

Subscribe

Subscribe to our email list to read all news first.

Subscribe
Related Articles
MinnesotaCRE

Cushman & Wakefield boosts multifamily investment sales staff in Minneapolis

March 6, 2026
TexasIndustrial

Colliers closes industrial lease at Westside 10 Industrial Park in Brookshire

March 6, 2026
MissouriRetail

CBRE to market former site of Jamestown Mall in St. Louis

March 6, 2026
WisconsinOffice

The Barry Company closes office sale in Milwaukee’s East Town neighborhood

March 6, 2026

Subscribe

Subscribe to our email list to read all news first.

Subscribe
REJournals logo

Market

  • Illinois
  • Indiana
  • Iowa
  • Kansas
  • Kentucky
  • Michigan
  • Midwest
  • Minnesota
  • Missouri
  • N Dakota
  • National
  • Nebraska
  • Ohio
  • S Dakota
  • Tennessee
  • Texas
  • Wisconsin

Sector

  • CRE
  • Education
  • Finance
  • Healthcare
  • Hospitality
  • Industrial
  • Legal
  • Multifamily
  • Net Lease
  • Office
  • Retail
  • section
  • Seniors Housing
  • Student Housing

Subscribe

Subscribe to our email list to read all news first.

Subscribe
  • Events
  • Office Locations
  • Terms and Conditions
  • Contact
© 2026 REjournals.com